The 2025 annual report is attached in European Single Electronic Format (ESEF). This information is subject to the disclosure requirements pursuant to section 5-12 of the Norwegian Securities Trading Act.
Attachment

The 2025 annual report is attached in European Single Electronic Format (ESEF). This information is subject to the disclosure requirements pursuant to section 5-12 of the Norwegian Securities Trading Act.
Attachment

Share
This news article is brought to you by: Southwest Pipe, leaders in Buying and Selling Surplus Pipe The WhiteWater-led joint venture plans two 48-inch natural gas pipelines from the Permian Basin to Katy, Texas, with a similarly sized second phase targeted to follow in...
This article is brought to you by: TuboScope, leaders in high performance internal coatings built to protect tubulars in harsh operating environments Targa says Wrangler, Ranger and Ranger II are planned with approximately 825 MMcf/d of combined processing capacity,...
This article is brought to you by: EV, leaders in visual analytics in pipeline integrity. DT Midstream says LEAP Phase 5 is designed to add 200 MMcf/d of Haynesville takeaway capacity, Viking Phase 1 carries a company-estimated $140 million to $160 million investment,...